France - near Paris
The first two plants were successfully commissioned in 2012. Thanks to their impressive performance and operational reliability, a larger number of additional plants were delivered in 2014. The installed plant size is around 740,000 m³ and is a prime example of the reliable implementation of high-performance systems in the field of water and wastewater technology.
Installed components
Key Data
Inlet of the wastewater treatment plant
- Inflow
- 2,830 l/s
- Operating time
- 24 h / 7 days per week
- Installation date
- 01/2013
Screen
Type MC112/85°
- No. of machines
- 1
- Slot opening
- 6 mm
- Screen width
- 2,000 mm
- Screen height
- 7,500 mm